Building Consultancy

Project Category
Office


Project
AON Centre Roof Refurbishment


Client
Precinct Properties


Location
AON Centre, Customs Street West, Auckland CBD


Size
21 Level Office Tower


Services Provided
RDW’s building surveying team was engaged to complete a 10 year long term maintenance plan for the AON Centre. Following this, RDW were instructed to procure roof refurbishment works recommended in the plan. Our responsibilities included:
  • A condition survey of the external and internal fabric of the tower.
  • Preparing a 10 year long term maintenance plan with budget costs and indicative scopes of work.
  • An options analysis for refurbishment of the main roof.
  • Developing detailed scopes of work and specifications, tendering the works and awarding contracts for the recommended roofing works.
  • Contract administration: compiling contract documentation and assessing payment claims, variations and warranties.
  • Works progress and programme monitoring plus quality assurance inspections.
Challenges
  • Access to the roof was limited to a narrow staircase. Use of cranes was not feasible due to the neighbouring buildings and project budget. The project needed to manage the transport of many tonnes of material on and off the roof manually. This included several tonnes of stone chip ballast material on top of the existing mastic asphalt roof and a redundant BMU cage.
  • Developing a durable refurbishment scope that did not require removal of the existing mastic roof due to the above access restrictions, the need to maintain weathertightness during the works without tenting the building and budget constraints.
  • Removing as many weathertightness weak points in the roof as possible, such as unnecessary roof penetrations for abseil anchor points. A solution involving certification of an existing BMU railing for abseil enabled all anchor points penetrating the roof to be removed.
  • Working around existing roof top plant, such as multiple cooling towers, that had to remain operational throughout the works.
  • Programming/timing of works to avoid disruption of tenancies below and to minimise weather-related delays.
Outcome
  • A detailed survey of the building that provided the buildings managers with an accurate summary of the buildings current condition.
  • A comprehensive 10 maintenance plan that considered the life span of the main building elements, the priority of the works, consenting considerations, operational impacts and scope options.
  • An options analysis that enabled the client to make informed decisions on the roof repairs best suited to their budget, the buildings access difficulties and long term plans for the building. This incorporated feedback from multiple contractors and roofing system suppliers to ensure the options presented were realistic.
  • Implementation of a repair option that avoided disruption for Tenants and the need to remove the existing roof coverings and other costly consequential works.
  • Developing tender documentation that enabled accurate and competitive pricing.
  • Assisting the client with contractor selection and tender analysis to ensure the appointed contract had the skills and experience required to complete the works to a high standard.
  • Delivery on programme and within budget.